This is inconvenient but will not cause a safety issue.

First of all the Chernobyl site has 3 offsite power supplies, 750kV, 330kV and 110kV. According to current media messages they only lost one so the site should still be on a normal offsite power supply.

Now even if the media reporting is incorrect and they've lost all 3 offsite power supplies they still have emergency diesel generators which can provide atleast 7 days of power each.

If those diesel generators are lost too they're on batteries which will die within hours. They have mobile diesel generators they can connect in order to keep them charged.

If these mobile diesel generators also fail they'll be without power if the batteries die. In that case they just lose monitoring systems which means they'll have to inspect the various waste storage facilities locally.

The spent fuel in the Chernobyl site is atleast 22 years old which means they no longer require active cooling. If all cooling were to be lost the water in the spent fuel pools will not exceed 70°C and thus will not boil off. So the facilities are safe even without power.


なんJより、海外の方が役立つわ。問題ないやんけ